Office fire-door installations in England

Fire-door installation: which documents does your client need?

Door schedules, product certificates, RAMS and installation records. What to check before work starts and what to give your client when it’s finished.

Reading theme
Architectural pen drawing of an installer pointing to a fire-door closer while the client reviews the door drawings and records in an open binder.

Check what your client needs

Start with these six documents. Confirm the client’s list before ordering. This guide covers timber fire doors in offices in England; the requirements depend on the building, product and work.

  1. 01 / Before work

    Door schedule

    A list of each door, its location and required fire and smoke rating.

    From the project specification

  2. 02 / Before work

    Product certification

    Certification covering the door and components being supplied.

    From the manufacturer or supplier

  3. 03 / Before work

    Fitting instructions

    The manufacturer’s instructions for the exact product.

    From the manufacturer

  4. 04 / Before work

    Site-specific RAMS

    How the doors will be moved, removed and fitted on this site.

    Prepared by your team

  5. 05 / During work / handover

    Installation record

    A record of what was fitted and checked for each door.

    Completed during installation

  6. 06 / At handover

    Maintenance guide

    Instructions for keeping the door and its hardware working.

    From the product suppliers

Check the certificate matches the door

Product certification covers the specified product. Your installation record shows what you fitted and checked. You need to keep the two linked.

  • Match the product. For a third-party certified door, use the label or plug code to trace its certification. Ask the manufacturer or supplier if identification is missing or unclear.
  • Check the contract. If the client requires an installer certification scheme, confirm which one before quoting. This is a third-party scheme that assesses installers and may issue certificates for work within its scope.

Sources: 1, 3

Check what you are ordering

Are you replacing only the door leaf — the moving panel — or the complete doorset, including its frame and hardware?

  1. Installer and client reviewing a door schedule, fitting instructions and hardware samples on a desk.

    01Door and components

    Confirm the required rating from the agreed door schedule and fire-safety design. Check that the certification allows the proposed frame, seals, glazing, hinges and other hardware. Get written confirmation from the manufacturer or relevant technical specialist before changing components or keeping an existing frame.

  2. Installer measuring an existing office doorway and keeping a survey clipboard.

    02Existing opening

    Check the opening, wall construction and frame condition. Get asbestos and service information before disturbing the building. Resolve survey gaps and agree any extra work before ordering.

Use the fitting instructions that match the product certification. Do not assume one door’s permitted gaps, fixings or hardware apply to another.

Sources: 2, 5, 6

Make your RAMS specific to the job

Describe the work and the controls for the actual site. Cover these four areas.

Architectural sketch of a partly open fire doorset, showing the closer, hinges, frame-to-wall junction and a work barrier set aside from the route.
Plan the door, the opening and the space around the work. Illustrative layout.
Moving doors
Record how heavy leaves and frames will be delivered, handled, supported and removed.
Fire protection
Agree the work sequence and temporary fire precautions with the site team. Keep escape routes available and protected while doors are being replaced.
Tools and dust
Cover cutting, drilling, dust control and the survey information used before disturbing walls or frames.
Work sequence
Set out the fitting steps and any client inspections needed before work continues.

Sources: 4, 5, 2

Keep a record for every door

Use the same door ID on the schedule, photos and check sheet. Add the location, date and installer’s details.

Architectural pen drawing of an installer checking a fitted fire door and recording findings on a clipboard, with a camera and door schedule nearby.
Keep the photos and measured checks with the record for that door.

Example layout · not a completed inspection

Door installation record

Door ID
D07
Location
Ground-floor meeting room
Installer
________________
Date
________________
Product reference
Manufacturer, model, label or plug code and certificate reference: ______
Before covering up
Photo references and details of frame fixings and the fire-resisting seal between the frame and wall: ______
Measured gaps
Head: ___ mm · Hinge side: ___ mm · Closing side: ___ mm · Threshold: ___ mm. Record the permitted limits from the fitting instructions alongside your readings.
Closing and hardware
Findings for the closer, latch where fitted, hinges, seals and any glazing: ______
Changes and defects
Approved changes, work still needed, who will fix it and target dates: ______
Record actual measurements and findingsD07

Sources: 2, 3, 1

Documents to give your client

Use this as a handover list. Confirm the agreed items are included and clearly matched to the doors installed.

Fire-door installation

Handover checklist

Client documents · ticks are not saved01

Before work starts, ask the project team whether Building Regulations approval and a Regulation 38 fire-safety handover are needed. If they are, agree which door records to include and when to supply them. Give the final documents to the client and the person responsible for the building’s fire safety, and keep a copy.

Sources: 6, 3

RAMSCloud helps you prepare RAMS. Arrange product certification and any required installation certificate separately.